Hern Greyt Works - Gifting information for our new kennel
July 12, 2008: HERN GREYT WORKS WELCOMES FIRST EX-RACERS
Saturday, the 12th of July was a busy day for GPI and many Greyhounds. The day was sunny and warm. There were Meet and Greet Booths and a Festival where Ex-Racers were well represented to a curious public. A milestone event occurred in the evening when 16 Retired Racers arrived as the first to be received at GPIs new kennel facility, Hern Greyt Works.
Volunteers assembled for the pre-arrival briefing and were ready to welcome the new hounds when the long-long trailer arrived. The induction process was executed smoothly: Unloading the hounds from the trailer, Leashing, muzzling, and tagging. Stretching and watering in the turnout yard. Processing through identification, worming medication, shots, Bordetella vaccination and initial examination. Flea treatment and a close inspection for tics. Introduction of the hounds to their own comfortable indoor run with lots of petting and comforting words of welcome. The next several days will be for bathing and a visit to the Vet for Spaying/Neutering, teeth cleaning, micro-chipping and physical. After some temperament testing and personality evaluation, ....Its Show Time! . booths, fostering, fun at turnouts, socializing and reputation building. A family to adopt and a Forever Home are now in the near future thanks to those who care and show it in so many ways by helping GPI do its good work.
The pictures tell the story:
Enjoy the event as if you were there..... http://www.greyhoundpetsinc.org/gallery/events/FirstDogLoadatHernGreytWorks/index/
June 23, 2008: The County has told me that they have issued our Kennel License, so we should see it this week. We are waiting for the final building inspection so we can get our temporary certificate of occupancy. There are some additional steps that have to be completed after the inspection in order for us to get our full certificate of occupancy. The striping of the parking lot has been completed. The fencing is well under way. The work on the kennel run drain covers is nearing completion. The big washer and dryer have been ordered. The restroom fixtures are installed, with a couple of minor exceptions. The grading has been completed and various areas hydro seeded. Some of the shelving in the kitchen and restroom is nearing completion. The flooring in the grooming/laundry area and adoption center is complete.
June 3, 2008: We have asphalt!!!! The floors in the adoption center and grooming/laundry room are nearly finished. Paint touch up is being done. Work on installing the kennel runs continues.
May 29, 2008: The kennel runs are being installed. The ground work for laying the asphalt is being done. The last of the outside painting is being completed. The sink in the kitchen is being installed. The floors in the adoption center and laundry/grooming room are scheduled for completion on Friday.
5/17/08: A work party was held today to spread hog fuel in the turnout area of the new kennel.
May 16, 2008: We're getting closer!!! The little yellow house is no more - it has been painted grey. They are working on painting the trim outside. The hose reels have been installed in the kennel areas. Some additional landscape planting has been done. All the doors have been installed and most of the door hardware has been installed. The ventilation equipment installation is nearly finished. The inside has been painted - both the walls and the trim. The track lighting has been installed. The lighting and ceiling tiles have been placed in the drop ceiling. The kennel runs have been delivered. The hogs fuel has been delivered.
May 6, 2008: The ceilings in the kennel areas have been painted. The primer coat of paint in the rest of the building has been completed. Most of the doors have been installed and the framing around the doors has been started and is well on the way to completion. The ventilation systems are installed. The lights in the t-bar ceiling have been installed.
April 17, 2008: The lighting in the kennel areas has been put in place. The framework for the drop ceiling is nearly in place. The outside vents for the kennel areas have been started. The framework for pouring the cement for the patios has been started.
April 8, 2008: The FRP (water-proof covering) is up on the kennel area walls. The taping and sanding of all the joints in the wallboard continues.
The FRP in the main kennel Taping and sanding the ceiling in the kennel The FRP going up in the quarantine kennel Taping and sanding the main adoption area
April 4, 2008: All the drywall/wallboard has been put up. The support posts for the overhangs continue to be placed. The taping of all the drywall/wallboard is in progress. The hose reels have been ordered. The application for the sprinkler permit has been submitted.
March 28, 2008: A lot more of the drywall has been installed. The taping of the seams of the wallboard in the kennel area has been started. The support beams for the overhangs are being installed.
(Click thumbnails for a better view)
March 20, 2008: The wallboard in the kennel areas continues to go up. The ditches out front have been cleaned up and culverts installed at strategic locations. A graveled area has been laid out that will be used for extra parking.
March 13, 2008: The wallboard is going up in the kennel area finally. This has been a complex process to ensure the materials used would meet sound and moisture resistant requirements. The heat is running well in all areas of the building. There are some kinks still to be worked out on the heating system. The main building's outside walls have been insulated. They have started digging the holes for the overhang support poles. The back-up generator has been installed. Decisions have been made on the ventilation system for the kennel area. Most of the wiring for phones, intercom system, and electrical have been completed. Most of the plumbing has been completed.
March 4, 2008: The county required landscaping is progressing well. The kennel area roof has been insulated. The propane tank has been placed, hooked up and filled. The heat in the kennel area has been tested and started. It is anticipated that they will start dry-walling the kennel area roof at the end of this week or start of next week once the kennel area is sufficiently warm and dry.
February 25, 2008: Wiring and plumbing are progressing. Insulation of the kennel area roof has been started. The siding has basically been completed. The landscaping is well on its way. Most of the exterior doors have been placed. The propane tank has been placed.
February 6, 2008: The kitchen/food prep room has been framed in as well as the blanket storage room. Some more of the siding has been put in place. Also more of the plumbing piping has been installed and work has been started on the electrical for the kennel building.
January 25, 2008: The kennel floors are poured!!!
The kennel floors in the main kennel looking good! The kennel floors in the quarantine kennel also looking good!
January 22, 2008: The retaining wall on the west side of the building has been put in place. The insulation and in-floor heating piping has been laid out. The cement pouring has started in the kennel building. Also, some of the siding has been started on the buildings. All the exterior windows are in place.
December 30, 2007: Some problems solved, insulation and steel reinforcement installed in kennel floor and floor heat tubing branches out to keep pups warm.
December 16, 2007: An open house was held at the new kennel so adopters and volunteers could have the opportunity to see the construction progress.
The new kennel now has an official name: The Hern Greyt Works. This is in honor of John Hern Jr, our founder. For those of you who knew John he had a business he ran in Idaho called the Hern Iron Works and the Iron Works housed our beautiful greyhounds for many years.
Most of the roofing tile has been put in place. The overhangs are nearly complete on the front and end of the kennel building.
The skylights have been placed both in the main and quarantine kennel areas.
More of the floor drains in the kennel areas have been placed.
December 11, 2007: The roofing is well on its way. The floor drains in the kennel building are being laid. The front overhang on the kennel building has been started.
The floor drains being laid in the kennel building. Moira, Don and the construction supervisor discussing the merits of skylights. The front overhang and entrance going on the kennel building.
December 6, 2007: A lot of roof work is happening on the kennel building. The roof prep work has been nearly completed and the roofing is going on. Also, some of the drain work is being started in the kennel area.
The roofing in progress The roofing and spaces where the skylights will be placed in the kennel building. The back side of the kennel building The drains waiting to be installed.
November 28, 2007: The roof trusses have been set in place and the plywood ready for the roofing has been started. The roof overhangs are well on their way. Some of the concrete prep has been started in the existing building.
November 12, 2007: The cul-de-sac and drive have been leveled and graveled. The trenches for the in-ground heating pipes have been dug and the pipes have been laid and mostly covered - they are now just waiting for their final pressure test. The trusses for the roof on the new kennel building have been delivered.
The cul-de-sac and drive being leveled and graveled. Rolling the gravel Laying the heating pipes The heating pipes ready for the pressure test The roof trusses being delivered
October 29, 2007: The walls of the new kennel building are up. Also the dog septic system is in progress. So far the tanks for the dog septic system have been set in place and some of the trenches dug and pipe work set in place.
The walls of the new kennel building are up. The tanks for the dog septic system are in The dog septic system going in.
October 24, 2007: The foundation and walls for the kennel building have been poured. Gravel has been poured in for the flooring of the kennel building. The concrete walls of the kennel building have been insulated. The entrance to the existing building has been framed out. The overhangs on the existing building are well on their way. The framing for the walls on the new kennel building has been started.
October 12, 2007: The initial drainage piping has been installed and the concrete poured for the foundation. The water from the street to the fire hydrant has been turned on so construction can continue.
October 1, 2007: The windows for the existing building have been delivered and partially installed. The framing work for the foundation for the new building has been started. The food storage room is framed in - this room will be mouse proofed. The ducting work for the heating/air conditioning in the existing building is installed. Some of the heating equipment has been set in place.
September 12, 2007: The tanks for the septic system have been installed. Also holes in the concrete of the existing building have been dug so the new plumbing can be installed. The duct work for the heating in the existing building has been started. The windows for the existing building are on order. Also, the trenches for the foundation of the new building have been dug.
August 31, 2007: The framing inside the existing building is well on its way.
August 24, 2007: The water line and hydrant are installed. The framing inside the existing building is started.
August 16, 2007: To date the prep work has begun in the existing building for putting up the walls and cutting holes in the concrete for some of the plumbing. Some of the framing for the windows has begun. All the old shelving in the existing building has been removed. The property has been cleared where the water line and fire hydrant are to be installed. Some grading has begun in preparation for the water line. Three of the garage doors we will not be using from the existing building have been removed and the two insulated ones have been moved to their new locations in the existing building.
July 30, 2007: Construction Begins!!!
July 8, 2007: Work Party at the new kennel site. We had a work party to clear out the existing building. A lot of work was done on going through everything, determining what was to be kept, what was to be thrown out, and what could be given away. Items were then moved to the storage container, into the little house or put in piles to be trashed or donated.
July 6, 2007: A storage container was delivered to the site for storing all GPI's valuables during construction.
June 24, 2007: Groundbreaking Ceremony. The work on the new kennel was kicked off with our Groundbreaking Ceremony. (Click thumbnails for a better view)
The Board Group picture at our groundbreaking event Our event cake Don proposes a toast The dogs cut loose