Introduction and updates provided by Moira Corrigan, President
   Photos courtesy of Jack Richardson, Chris & Ross Nooney and Don St Clair


Gifting and donation information for our new kennel

Greyhound Pets, Inc.
07.12.08kennel.jpg (81292 bytes) John A. Hern Jr. began organizing Greyhound Pets, Inc. in 1985. John’s love for the Ex-Racer Greyhound is shown and remembered in “Hern Greyt Works”, GPI’s newly completed kennel facility in Woodinville, WA. John’s generous bequest made it possible for dedicated volunteers to develop this full-featured kennel facility equipped to house 37 Ex-Racers in individual indoor kennel runs. After one year in construction, “Hern Greyt Works” is now caring for Retired Racing Greyhounds being prepared to join an adopting family in a “Forever Home”

The story of construction and arrival of the first 16 hounds at "Hern Greyt Works" is shown below in progress pictures, reports and a link to the First Arrival Day presentation.

All who are associated with GPI, and every GPI Greyhound, are greytful for the dedication and hard work of the Kennel Committee; Don St.Clair (Chair), Bob and Yumi Burnett, Susie Kush and Marchet Anschell. There are countless others who donated time and treasure and who served as Directors and Officers of GPI. Thanks to them all.

4,876 Retired Racers and counting as of 12 July 2008.

  

bluefadeline.gif (2018 bytes)

 

July 12, 2008:

HERN GREYT WORKS WELCOMES FIRST EX-RACERS

Saturday, the 12th of July was a busy day for GPI and many Greyhounds. The day was sunny and warm. There were Meet and Greet Booths and a Festival where Ex-Racers were well represented to a curious public. A milestone event occurred in the evening when 16 Retired Racers arrived as the first to be received at GPI’s new kennel facility, “Hern Greyt Works”.

Volunteers assembled for the pre-arrival briefing and were ready to welcome the new hounds when the long-long trailer arrived. The induction process was executed smoothly: Unloading the hounds from the trailer, Leashing, muzzling, and tagging. Stretching and watering in the turnout yard. Processing through identification, worming medication, shots, Bordetella vaccination and initial examination. Flea treatment and a close inspection for tics. Introduction of the hounds to their own comfortable indoor run with lots of petting and comforting words of welcome. The next several days will be for bathing and a visit to the Vet for Spaying/Neutering, teeth cleaning, micro-chipping and physical. After some temperament testing and personality evaluation, ....It’s Show Time!…. booths, fostering, fun at turnouts, socializing and reputation building. A family to adopt and a “Forever Home” are now in the near future thanks to those who care and show it in so many ways by helping GPI do its good work.

The pictures tell the story:

Enjoy the event as if you were there..... http://www.greyhoundpetsinc.org/gallery/events/FirstDogLoadatHernGreytWorks/index/

 

bluefadeline.gif (2018 bytes)



June 23, 2008: The County has told me that they have issued our Kennel License, so we should see it this week. We are waiting for the final building inspection so we can get our temporary certificate of occupancy. There are some additional steps that have to be completed after the inspection in order for us to get our full certificate of occupancy. The striping of the parking lot has been completed. The fencing is well under way. The work on the kennel run drain covers is nearing completion. The big washer and dryer have been ordered. The restroom fixtures are installed, with a couple of minor exceptions. The grading has been completed and various areas hydro seeded. Some of the shelving in the kitchen and restroom is nearing completion. The flooring in the grooming/laundry area and adoption center is complete.

 

06.21.08_142.JPG (34058 bytes) 06.18.08_6882.jpg (16352 bytes) 06.19.08_6888.JPG (61751 bytes)
Parking Lot striping Kennel Run drain covers Hydroseeding
06.21.08_137.JPG (53565 bytes) 06.18.08_6885.JPG (10963 bytes) 06.21.08_128.JPG (66673 bytes)
Hydroseeding Rest Room fixtures Fencing being installed
06.19.08_6889.JPG (69297 bytes) 06.11.08_6866.JPG (26783 bytes) 06.11.08_6873.JPG (32088 bytes)
More fencing being installed The floor in the adoption center The hoses installed in the main kennel
06.11.08_6874.JPG (36488 bytes) 06.11.08_6875.JPG (13812 bytes)
The hoses installed in the quarantine kennel The shelving in the kitchen



bluefadeline.gif (2018 bytes)

 

June 3, 2008: We have asphalt!!!! The floors in the adoption center and grooming/laundry room are nearly finished. Paint touch up is being done. Work on installing the kennel runs continues.

 

06.03.08_434.jpg (44342 bytes) 06.03.08_438.jpg (53104 bytes)
A little tidy up still needed to be done here. Asphalt!
06.03.08_439.jpg (51306 bytes) 06.03.08_441.jpg (58569 bytes)
More asphalt! And more asphalt!



bluefadeline.gif (2018 bytes)

 

May 29, 2008: The kennel runs are being installed. The ground work for laying the asphalt is being done. The last of the outside painting is being completed. The sink in the kitchen is being installed. The floors in the adoption center and laundry/grooming room are scheduled for completion on Friday.

5.29.08_6822.jpg (60603 bytes) 5.29.08_6823.jpg (23007 bytes) 5.29.08_6825.jpg (20512 bytes)
The kennel runs in the main kennel Inside one of the runs. The supports and the benches covering the drain are still to be installed. The sink being installed in the kitchen.
5.29.08_6826.jpg (28927 bytes) 5.29.08_6829.jpg (54743 bytes) 5.29.08_6830.jpg (69453 bytes)
The start of the kennel run installation in the quarantine kennel. The ground work for the laying of the asphalt The outside painting
And now, for something a little different.  Mary Gibbons models the latest fashion trend for kennel turnout volunteers.  Take note of the double string of pearls.

------->

mary2.jpg (51694 bytes) mary1.jpg (48659 bytes)



bluefadeline.gif (2018 bytes)

 

5/17/08: A work party was held today to spread hog fuel in the turnout area of the new kennel. 

 

05.18.08_405.jpg (59039 bytes) 05.18.08_407.jpg (69228 bytes) 05.18.08_408.jpg (66735 bytes)
Mary, Yumi, Ed hard at work Jack at work with the tractor The hog fuel spread in the main turnout area
05.18.08_409.jpg (83090 bytes) 05.18.08_410.jpg (74817 bytes) 05.18.08_414.jpg (75591 bytes)
Adjusting the gate The main turnout area Lunch and final adjustments on the gate
05.18.08_416.jpg (87501 bytes)
Mary, Richard and Beverly



bluefadeline.gif (2018 bytes)

 

May 16, 2008: We're getting closer!!! The little yellow house is no more - it has been painted grey. They are working on painting the trim outside. The hose reels have been installed in the kennel areas. Some additional landscape planting has been done. All the doors have been installed and most of the door hardware has been installed. The ventilation equipment installation is nearly finished. The inside has been painted - both the walls and the trim. The track lighting has been installed. The lighting and ceiling tiles have been placed in the drop ceiling. The kennel runs have been delivered. The hogs fuel has been delivered.



05.13.08_0345.jpg (24723 bytes) 05.13.08_0351.jpg (24288 bytes) 05.13.08_0357.jpg (21029 bytes)
Laundry/grooming room The painting has been completed The painting has been completed and doors installed.
05.13.08_0365.jpg (52839 bytes) 05.15.08_6738.jpg (39460 bytes) 05.15.08_6740.jpg (18285 bytes)
The plantings in front of the building. The hose reels installed in the main kennel The hose reels installed in the quarantine kennel
05.15.08_6749.jpg (92566 bytes) 05.15.08_6751.jpg (35764 bytes) 05.15.08_6744.jpg (70735 bytes)
Mitigation plantings in the native growth protection area Some of the ventilation equipment on the roof. The little yellow house painted
05.15.08_6747.jpg (62355 bytes) 05.15.08_6734.jpg (55727 bytes) 05.15.08_6757.jpg (82917 bytes)
The kennel runs delivered The hogs fuel delivered The second load of hogs fuel delivered
05.15.08_6741.jpg (19524 bytes) 05.15.08_6742.jpg (25452 bytes)
The track lighting installed The lighting and ceiling tiles in the training room.



bluefadeline.gif (2018 bytes)

 

May 6, 2008: The ceilings in the kennel areas have been painted. The primer coat of paint in the rest of the building has been completed. Most of the doors have been installed and the framing around the doors has been started and is well on the way to completion. The ventilation systems are installed. The lights in the t-bar ceiling have been installed.

05.02.08_204.jpg (48205 bytes) 05.02.08_210.jpg (34570 bytes) 05.01.08_6723.jpg (14099 bytes)
The lighting in the Adoption Center The lighting and painted ceilings in the main kennel The doors going in.
05.01.08_6722.jpg (56400 bytes) 05.01.08_6728.jpg (18865 bytes) 04.29.08_6720.jpg (47026 bytes)
The ventilation system in the quarantine kennel being installed The heat recovery system. The patio poured in front of the quarantine kennel
04.29.08_6721.jpg (32870 bytes)
The patio poured in the main turnout area

 

 

bluefadeline.gif (2018 bytes)

 

April 17, 2008: The lighting in the kennel areas has been put in place. The framework for the drop ceiling is nearly in place. The outside vents for the kennel areas have been started. The framework for pouring the cement for the patios has been started.

 

04.17.08_6693.jpg (41970 bytes) 04.17.08_6694.jpg (37414 bytes) 04.17.08_6695.jpg (33584 bytes)
The lighting in the quarantine kennel and the finishing of the walls The framework being started for the patio in the turnout area The start of the vents going in for the kennel areas
04.17.08_6696.jpg (47516 bytes) 04.17.08_6697.jpg (41720 bytes) 04.17.08_6699.jpg (59972 bytes)
The lighting in the main kennel and the finishing of the walls The start of the piping for the sprinkler system The framework for the drop ceiling in the adoption area
04.17.08_6700.jpg (67587 bytes) 04.17.08_6701.jpg (46739 bytes)
The framework for the drop ceiling in the training room The framework being started for the patio in the quarantine turnout area



bluefadeline.gif (2018 bytes)

 

April 8, 2008: The FRP (water-proof covering) is up on the kennel area walls. The taping and sanding of all the joints in the wallboard continues.

 

04.07.08_6667.jpg (42730 bytes) 04.07.08_6668.jpg (38987 bytes)
The FRP in the main kennel Taping and sanding the ceiling in the kennel
04.07.08_6669.jpg (36924 bytes) 04.07.08_6671.jpg (43764 bytes)
The FRP going up in the quarantine kennel Taping and sanding the main adoption area



bluefadeline.gif (2018 bytes)

 

April 4, 2008: All the drywall/wallboard has been put up. The support posts for the overhangs continue to be placed. The taping of all the drywall/wallboard is in progress. The hose reels have been ordered. The application for the sprinkler permit has been submitted.


04.02.08_483.jpg (65386 bytes) 04.02.08_484.jpg (64071 bytes) 04.02.08_487.jpg (47309 bytes)
The support posts for the overhang being put in place. The support posts for the side overhang being put in place. The wallboard in place in the quarantine kennel.
04.02.08_489.jpg (43071 bytes) 04.02.08_490.jpg (43862 bytes) 04.02.08_499.jpg (38578 bytes)
The wallboard in place in the main kennel. The taping in progress The taping in progress
04.02.08_500.jpg (58208 bytes) 04.02.08_509.jpg (69580 bytes)
The main entry area The grass growing in the landscaping and the plants in place

 

bluefadeline.gif (2018 bytes)

 

March 28, 2008: A lot more of the drywall has been installed. The taping of the seams of the wallboard in the kennel area has been started. The support beams for the overhangs are being installed.
(Click thumbnails for a better view)



03.27.08_6661.jpg (21750 bytes) 03.27.08_6662.jpg (32279 bytes) 03.27.08_6665.jpg (59799 bytes)
Wallboard taping in kennel area Support posts being installed Support posts being installed
03.27.08_6664.jpg (38223 bytes) 03.27.08_6659.jpg (42479 bytes) 03.27.08_6657.jpg (39122 bytes)
Wallboard and taping Standing in the warehouse area looking towards the main entrance Standing in the main entrance looking towards the warehouse area

 

bluefadeline.gif (2018 bytes)

 

March 20, 2008: The wallboard in the kennel areas continues to go up. The ditches out front have been cleaned up and culverts installed at strategic locations. A graveled area has been laid out that will be used for extra parking.


3.20.08_6640.jpg (51389 bytes) 3.20.08_6642.jpg (44445 bytes) 3.20.08_6643.jpg (40484 bytes) 3.20.08_6641.jpg (68028 bytes)
One of the ditches/culverts Another of the ditches Another of the ditches/culverts The graveled area
3.20.08_6644.jpg (56013 bytes) 3.20.08_6645.jpg (30199 bytes) 3.20.08_6647.jpg (32361 bytes) 3.20.08_6648.jpg (30687 bytes)
Wallboard going up in the main kennel area Wallboard in the main kennel area Wallboard in the main kennel area Wallboard in the ceiling over the kitchen

 

bluefadeline.gif (2018 bytes)

 

March 13, 2008: The wallboard is going up in the kennel area finally. This has been a complex process to ensure the materials used would meet sound and moisture resistant requirements. The heat is running well in all areas of the building. There are some kinks still to be worked out on the heating system. The main building's outside walls have been insulated. They have started digging the holes for the overhang support poles. The back-up generator has been installed. Decisions have been made on the ventilation system for the kennel area. Most of the wiring for phones, intercom system, and electrical have been completed. Most of the plumbing has been completed.

 

03.13.08_6629.jpg (50623 bytes) 03.13.08_6630.jpg (48076 bytes) 03.13.08_6637.jpg (41340 bytes)
The wallboard going up on the kennel area ceiling The wallboard going up on the kennel area ceiling Part of the heating system
03.13.08_6635.jpg (42522 bytes) 03.13.08_6633.jpg (41063 bytes) 03.13.08_6632.jpg (35610 bytes)
Part of the heating system The front entrance insulated and framed in The plumbing for the in-floor heat in the kennel area
03.13.08_6628.jpg (22665 bytes)
An outside door installed

 

bluefadeline.gif (2018 bytes)



March 4, 2008: The county required landscaping is progressing well. The kennel area roof has been insulated. The propane tank has been placed, hooked up and filled. The heat in the kennel area has been tested and started. It is anticipated that they will start dry-walling the kennel area roof at the end of this week or start of next week once the kennel area is sufficiently warm and dry
.  

 

03.01.08_471.jpg (47192 bytes) 03.01.08_473.jpg (60237 bytes) 03.01.08_475.jpg (66479 bytes)
The siding pretty well complete The landscaping at the back of the building The landscaping at the side of the building
03.01.08_476.jpg (63134 bytes) 03.01.08_477.jpg (60628 bytes) 03.01.08_479.jpg (70574 bytes)
Another view of the landscaping at the side of the building The propane tank placed Another view of the landscaping at the back of the building. Also, some of the siding.
03.01.08_480.jpg (48522 bytes)
The front of the kennel building


bluefadeline.gif (2018 bytes)

 

February 25, 2008: Wiring and plumbing are progressing. Insulation of the kennel area roof has been started. The siding has basically been completed. The landscaping is well on its way. Most of the exterior doors have been placed. The propane tank has been placed.


bluefadeline.gif (2018 bytes)



February 6, 2008: The kitchen/food prep room has been framed in as well as the blanket storage room. Some more of the siding has been put in place. Also more of the plumbing piping has been installed and work has been started on the electrical for the kennel building.

 

More of the siding is in place Kitchen/food prep room framed in Blanet storage room framed in
Some more of the siding in place The blanket storage room framed in The kitchen/prep room framed in

 

bluefadeline.gif (2018 bytes)


January 25, 2008:  The kennel floors are poured!!!  


01.25.08_272.jpg (44127 bytes) 01.25.08_274.jpg (41179 bytes)
The kennel floors in the main kennel looking good! The kennel floors in the quarantine kennel also looking good!

 

bluefadeline.gif (2018 bytes)



January 22, 2008: The retaining wall on the west side of the building has been put in place. The insulation and in-floor heating piping has been laid out. The cement pouring has started in the kennel building. Also, some of the siding has been started on the buildings. All the exterior windows are in place.

 

01.04.08_177.jpg (63829 bytes) 01.11.08_211.jpg (58945 bytes) 01.11.08_212.jpg (60047 bytes)
The ground work for the retaining wall being completed. The retaining wall completed The insulation and in-floor heating piping ready and waiting for the pouring of the cement.
01.11.08_214.jpg (60265 bytes) 01.22.08_254.jpg (61094 bytes) 01.22.08_267.jpg (45134 bytes)
The in-floor heating piping spaghetti The first pouring of cement in the kennel building The next pouring of cement in the kennel building


bluefadeline.gif (2018 bytes)

 

December 30, 2007:  Some problems solved, insulation and steel reinforcement installed in kennel floor and floor heat tubing branches out to keep pups warm.

 

12_19_07113.jpg (88245 bytes) 12_19_07115.jpg (85025 bytes)
This is Moira, Don and Brad contemplating a minor problem at the year-end on site conference. This is Moira, Don and Brad after the problem solution was found to be simple.
12_30_07170.jpg (83947 bytes) 12_30_floorheat.jpg (72226 bytes)
Insulation and steel reinforcement installed in kennel floor. Floor heat tubing branches out to keep pups warm


bluefadeline.gif (2018 bytes)


December 16, 2007: An open house was held at the new kennel so adopters and volunteers could have the opportunity to see the construction progress.

The new kennel now has an official name: The Hern Greyt Works. This is in honor of John Hern Jr, our founder. For those of you who knew John he had a business he ran in Idaho called the Hern Iron Works and the Iron Works housed our beautiful greyhounds for many years.

Most of the roofing tile has been put in place. The overhangs are nearly complete on the front and end of the kennel building.

The skylights have been placed both in the main and quarantine kennel areas.

More of the floor drains in the kennel areas have been placed. 


IMG_01141.jpg (55553 bytes) IMG_00651.jpg (65579 bytes) IMG_00661.jpg (70637 bytes)
Some of the kennel tour participants. More of the kennel tour participants checking out the new kennel space. More of the floor drains in place in the kennel area.
IMG_00981.jpg (68113 bytes) IMG_01271.jpg (60276 bytes) New Addition with skylights.JPG (80043 bytes)
Kennel tour participants (Mike, Bev, Cathy, Moira & Chris) checking out the turnout area. Bob, Mary and Yumi discussing the new kennel area. Kennel building with more of the roofing tile in place and the skylights inserted.
End of Kennel with Overhang.jpg (68269 bytes) quarantineside.jpg (66200 bytes)
The overhang at the end of the kennel building (in what will be the turnout area). the drains being placed in the quarantine kennel.

 

bluefadeline.gif (2018 bytes)

 

December 11, 2007: The roofing is well on its way. The floor drains in the kennel building are being laid. The front overhang on the kennel building has been started. 


12.11.07_087.jpg (84403 bytes) 12.11.07_089.jpg (68207 bytes) 12.11.07_097.jpg (79262 bytes)
The floor drains being laid in the kennel building. Moira, Don and the construction supervisor discussing the merits of skylights. The front overhang and entrance going on the kennel building.

 

bluefadeline.gif (2018 bytes)

 

December 6, 2007:  A lot of roof work is happening on the kennel building. The roof prep work has been nearly completed and the roofing is going on. Also, some of the drain work is being started in the kennel area.  


12.06.07_280.jpg (69588 bytes) 12.06.07_285.jpg (46842 bytes)
The roofing in progress The roofing and spaces where the skylights will be placed in the kennel building.
12.06.07_286.jpg (48263 bytes) 12.06.07_287.jpg (78888 bytes)
The back side of the kennel building The drains waiting to be installed.

 

bluefadeline.gif (2018 bytes)

 

November 28, 2007: The roof trusses have been set in place and the plywood ready for the roofing has been started. The roof overhangs are well on their way. Some of the concrete prep has been started in the existing building. 



11.16.07_085.jpg (56327 bytes) 11.27.07_108.jpg (31210 bytes) 11.27.07_112.jpg (62383 bytes)
The roof trusses being set in place. The plywood for the roofing in progress The roof trusses from inside the kennel building.
11.27.07_116.jpg (55738 bytes) 11.27.07_103.jpg (58263 bytes) 11.27.07_105.jpg (51400 bytes)
The front side of the kennel building. "Build it just like this...." - Moira talking to Brad the construction supervisor. "No, like this...." - Brad talking to Moira.
11.27.07_106.jpg (62504 bytes)
The side of the new kennel building.

 

bluefadeline.gif (2018 bytes)

 

November 12, 2007: The cul-de-sac and drive have been leveled and graveled. The trenches for the in-ground heating pipes have been dug and the pipes have been laid and mostly covered - they are now just waiting for their final pressure test. The trusses for the roof on the new kennel building have been delivered. 

 

11.02.07_186#9fc9.jpg (72358 bytes) 11.02.07_189#079d.jpg (68322 bytes) 11.02.07_193#304c.jpg (72091 bytes)
The cul-de-sac and drive being leveled and graveled. Rolling the gravel Laying the heating pipes
11.08.07_202#bc20.jpg (82244 bytes) 11.08.07_223#f7b0.jpg (66259 bytes)
The heating pipes ready for the pressure test The roof trusses being delivered


bluefadeline.gif (2018 bytes)


October 29, 2007:  The walls of the new kennel building are up. Also the dog septic system is in progress. So far the tanks for the dog septic system have been set in place and some of the trenches dug and pipe work set in place. 


10.28.07_010.jpg (55617 bytes) 10.28.07_011.jpg (81341 bytes) 10.28.07_025.jpg (80177 bytes)
The walls of the new kennel building are up. The tanks for the dog septic system are in The dog septic system going in.

 

bluefadeline.gif (2018 bytes)

 

October 24, 2007:  The foundation and walls for the kennel building have been poured. Gravel has been poured in for the flooring of the kennel building. The concrete walls of the kennel building have been insulated. The entrance to the existing building has been framed out. The overhangs on the existing building are well on their way. The framing for the walls on the new kennel building has been started. 

 

Building entrance Insulated kennel walls Tight fit!
The framing for the entrance to the existing building in progress. Also the overhangs on the existing building are well on their way. The walls of the kennel building being insulated. Oooh, that's a tight fit.
Gravel being poured More completed kennel entrance Framing for the entrance
The gravel being poured in for the floor base of the new kennel building. The entrance to the existing building more complete The framing of the doorways in the kennel building is started
10.24.07_389.jpg (66100 bytes) 10.24.07_390.jpg (51077 bytes)
Framing of the walls Framing of the walls

 

bluefadeline.gif (2018 bytes)

 

October 12, 2007: The initial drainage piping has been installed and the concrete poured for the foundation. The water from the street to the fire hydrant has been turned on so construction can continue. 


drainagepipelaid.jpg (82630 bytes) drainagecompleted.jpg (80290 bytes) concretepoured.jpg (73491 bytes)
Laying some of the drainage pipe Some of the drainage work completed The concrete being poured

 

bluefadeline.gif (2018 bytes)

 

October 1, 2007: The windows for the existing building have been delivered and partially installed. The framing work for the foundation for the new building has been started. The food storage room is framed in - this room will be mouse proofed. The ducting work for the heating/air conditioning in the existing building is installed. Some of the heating equipment has been set in place.  

treeremoved.jpg (57229 bytes) foodroom.jpg (54201 bytes) hivolumeducts.jpg (58787 bytes)
The big tree is removed ready for the next stage of construction. The food room is framed in. The ducting work in the existing building.
windowsinstalled.jpg (59371 bytes) foundationframing.jpg (66262 bytes)
The windows are installed in the existing building. The framing work for the foundation on the new building is started.

 

bluefadeline.gif (2018 bytes)

 

September 12, 2007:  The tanks for the septic system have been installed. Also holes in the concrete of the existing building have been dug so the new plumbing can be installed. The duct work for the heating in the existing building has been started. The windows for the existing building are on order. Also, the trenches for the foundation of the new building have been dug. 


septicinstalled.jpg (75752 bytes) holesnewplumbing.jpg (88690 bytes) trenchesnewfoundation.jpg (75272 bytes)
Part of the septic system being installed Holes being dug in the existing building for the new plumbing Trenches for the foundation of the new building being dug
ductwork.jpg (91785 bytes) franksit.jpg (79921 bytes) franknewhydrant.jpg (84853 bytes)
The duct work going in Greyhounds really can sit. Frank checking out the new kennel. Frank checking out the new hydrant.

 

bluefadeline.gif (2018 bytes)

 

August 31, 2007: The framing inside the existing building is well on its way. 

 

Framing August 31 Framing August 31
Framing the inside of the existing building

 

bluefadeline.gif (2018 bytes)



August 24, 2007: The water line and hydrant are installed. The framing inside the existing building is started.  

Water Line Framing August 24
The water line and fire hydrant installed The start of the framing of the existing building


bluefadeline.gif (2018 bytes)



August 16, 2007: To date the prep work has begun in the existing building for putting up the walls and cutting holes in the concrete for some of the plumbing. Some of the framing for the windows has begun. All the old shelving in the existing building has been removed. The property has been cleared where the water line and fire hydrant are to be installed. Some grading has begun in preparation for the water line. Three of the garage doors we will not be using from the existing building have been removed and the two insulated ones have been moved to their new locations in the existing building. 

Cutouts for our windows Cutting for the insulated garage door Silt fencing
August 10 - The framing of the windows in the existing building begins. August 10 - The hole is cut in the building for one of the insulated garage doors. August 15 - The clearing of the land in preparation for the water line installation.
Silt fencing Moira and the water line supervisor Don and the construction supervisor
August 15 - The silt fences are installed. August 15 - Moira talking to the water line construction firm August 15 - Don talking to the construction supervisor
Land clearing Land clearing Prep work
August 15 - Land clearing in preparation for the new building. August 16 - The site for the new building is the process of being cleared August 16 - Prep work for the new entrance

 

bluefadeline.gif (2018 bytes)


July 30, 2007: Construction Begins!!!

 

July 8, 2007: Work Party at the new kennel site. We had a work party to clear out the existing building. A lot of work was done on going through everything, determining what was to be kept, what was to be thrown out, and what could be given away. Items were then moved to the storage container, into the little house or put in piles to be trashed or donated.

bluefadeline.gif (2018 bytes)



July 6, 2007: A storage container was delivered to the site for storing all GPI's valuables during construction.

bluefadeline.gif (2018 bytes)



June 24, 2007: Groundbreaking Ceremony. The work on the new kennel was kicked off with our Groundbreaking Ceremony.  (Click thumbnails for a better view)

GPI Board group.jpg (43162 bytes)
The Board Group picture at our groundbreaking event
cake.jpg (48778 bytes) toast.jpg (94130 bytes) groundbreakingfun2.jpg (87883 bytes)
Our event cake Don proposes a toast The dogs cut loose


 